EstuaryWatch Data Portal
Estuary event details
Estuary | Barham River Estuary |
---|---|
Region | Corangamite CMA |
Event type | Estuary Entrance Opening |
Date and time | 14 December 2018 18:15pm |
Description |
13/12/2018 at 18.15 the Barham river mouth is closed, seas are slight and a gentle NW breeze. Berm clearance is 0.1m and the estuary height is 1.02m. 14/12/2018 at 14.45 the river mouth is just open. Flow is out into rough seas and a strong Easterly wind.The Estuary height is 1.44m. Later at 18.15 the river mouth is still open but estuary height is 1.48m. Tide is going out. 13/12/2018 at 08.30 the Paradise river flow gauge is at 0.228m. On 14/12/2018 at 11.15 the river gauge is at 0.30m. |
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au