Estuary event details
Estuary Wreck Creek
Region West Gippsland CMA
Event type Estuary Entrance Opening
Date and time 24 April 2020 08:00am
Description

In April 2020, a new mouth was established at Wreck Creek. Traditionally when flows in the creek increased over late winter / spring, water would flow out of the sand berm into the ocean at the most easterly extent of the creek. In April large ocean swells removed a large section of coastal vegetation and separated the creek into two (i.e. an east and west tributary). Recent high creek flows have been flowing out to the ocean through this section of the creek ever since this event.

19-07-2020 14:35:
Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au