Powlett River Estuary

Download

255 results found (Displaying 151 - 200)
ID Date Status Details
#5352 18 Jul 2015 Approved Notes: Open, Very wide opening.
River beginning to meander more at the mouth.
Old berm level 1.5 metres drop to flowing water
#5346 15 Jul 2015 Approved
#5349 13 Jul 2015 Approved
#5355 6 Jul 2015 Approved
#5345 4 Jul 2015 Approved
#5348 3 Jul 2015 Approved
#5350 3 Jul 2015 Approved Notes: Estuary being artifically opened
#5347 2 Jul 2015 Approved
#5330 29 Jun 2015 Approved
#5332 22 Jun 2015 Approved
#5331 11 Jun 2015 Approved Notes: Ocean water appears to have recently flowed over the berm.
#5316 29 May 2015 Approved
#5315 21 May 2015 Approved Notes: Evidence of attempted estuary opening
#5310 16 May 2015 Approved Notes: Water level has risen 0.33 metre in one week after significant rain.
#5312 14 May 2015 Approved Notes: Farm flooding become more extensive
#5308 9 May 2015 Approved
#5329 7 May 2015 Approved Notes: Waves overtopping the sand berm, then flowing back out to sea.
#5307 23 Apr 2015 Approved
#5304 18 Apr 2015 Approved
#11165 14 Apr 2015 Approved
#11151 2 Apr 2015 Approved
#5290 24 Mar 2015 Approved Notes: Waves appear to be capping the berm at high tide. School of Salmon (<50) found swimming close to mouth.
#5289 11 Mar 2015 Approved Notes: High tide waves appear to have been topping the sand berm
#5288 6 Mar 2015 Approved Notes: 1) Waves overtopping the sand berm
2) 14 Hooded Plovers sighted at the mouth
#5283 27 Feb 2015 Approved
#5278 16 Feb 2015 Approved Notes: Recent flows have not effected the condition of the estuary mouth.
#5277 9 Feb 2015 Approved
#5274 23 Jan 2015 Approved
#5269 9 Jan 2015 Approved
#5268 16 Dec 2014 Approved
#5265 29 Nov 2014 Approved
#5264 15 Nov 2014 Approved Notes: Reduced flow due to sand deposition at the entrance. It would appear that the mouth may close over, if low flow conditions continue.
#5242 9 Aug 2014 Approved Notes: Bloody freezing.
Quite a bit of river erosion heading towards the sea on the left hand side. Quite a lot of flotsam strewn along the sides of the river up to the car park
#5238 1 Jul 2014 Approved Notes: John Reid joined me for some training for Estuary Watch.
#5234 30 Jun 2014 Approved
#5233 25 Jun 2014 Approved Notes: Mouth had gathered quite a bit of sand, and looked close to closing over.
#5232 12 Jun 2014 Approved
#5229 7 Jun 2014 Approved
#5228 21 May 2014 Approved
#5207 10 May 2014 Approved
#5205 11 Apr 2014 Approved
#5199 29 Mar 2014 Approved
#5202 26 Mar 2014 Approved
#5198 12 Mar 2014 Approved
#5193 22 Feb 2014 Approved
#5191 6 Feb 2014 Approved Notes: Lefthand entrance closed, water only flowing out via righthand side.
#5189 28 Jan 2014 Approved Notes: Significant flood/tide delta formation behind the main entrance (refer to photos for more information).
#5180 14 Dec 2013 Approved Notes: gauge board needs cleaning.
#5177 13 Oct 2013 Approved
#5171 5 Jul 2013 Approved Notes: A lot of sea foam blowing onto the beach
Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au