Estuary event details
Estuary Wreck Creek
Region West Gippsland CMA
Event type Estuary Entrance Opening
Date and time 25 July 2017 18:00pm
Description

An artificial estuary opening was performed @ 6pm at low tide to introduce some much needed saltwater into the estuary to improve the chances of survival for resident bream (of all age classes) that were experiencing a winter kill event. This event was caused by the introduction of very cold freshwater into the creek, which lowered their immune systems allowing a parasitic infection to infect their eyes and skin, causing many fatalities. The opening performed was very deep to allow for the introduction of a significant amount of warmer saltwater into the estuary, which also allowed for the migration of the Bream out to sea.  Given the urgency of this situation the opening was performed at low tide. 

Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au