EstuaryWatch Data Portal
Estuary event details
Estuary | Barham River Estuary |
---|---|
Region | Corangamite CMA |
Event type | Weather Event |
Date and time | 16 May 2009 16:00pm |
Description |
After several days of West to Nth-West winds a large swell had built up and 3 metre waves were coming into the Barham River Mouth. The estuary water height was 1.39mAHD at 10:15 and the river mouth was open with flow out. At 17:15 the estuary water level was 1.78mAHD and the river mouth was still just open with flow in and out.The peak tide recording at the harbour was at 16:33, was 1.19mAHD. As well as the sea flooding the estuary, the large waves entering the river mouth undercut the cliff at the base of Pt Bunbury. One metre and more in depth, 2 to 4 metres in height, the cliff collapsed over a distance of 60 metres. Significant damage to Pt Bunbury under photopoint BmP1 occurred. |
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au