Wye River Estuary

Download

280 results found (Displaying 176 - 200)
ID Date Status Details
#10789 5 Feb 2017 Approved Notes:

The sign that says no swimming in the mouth of the river is still  in position on the beach. This sign has been in place for over one year indicating that it is unsafe to swim in the estuary for all of that time - which is untrue. Juliet has spoken to council employees about the sign - but there has been no action.

There is a lot of algae in the river - both sides of the river and upstream 

#10718 15 Jan 2017 Approved Notes:

Helen Moriarty assisted with entering today's data as a new volunteer.

#10663 1 Jan 2017 Approved Notes:

We had two observer/ visitors:

  • Sam , a Wye river semi-permanent resident and an employee from Gippsland CMA region - was an observer 
  •  Jennifer Wood -a Wye river semi-permanent resident.

The signs - (that have been installed on Wye River beachfront location for over 12 months - first installed in December 2015) indicating that the estuary is unsuitable for swimming - are still in place.

 The stormwater,  outlet flowing onto the beach,  adjacent to the pub is making the sand black- see photo 

 

#10653 18 Dec 2016 Approved
#10592 4 Dec 2016 Approved Notes:
  • Lagoon increasing in size.
  • Water flow reduced.
  • More people.
#10560 20 Nov 2016 Approved
#10619 6 Nov 2016 Approved
#10514 16 Oct 2016 Approved
#10553 2 Oct 2016 Approved Notes:

Water level below gauge base.

Daylight saving time started last night.

When doing Waterwatch yesterday at 9.30 am, there was tidal in-flow under the bridge up to the Fishing Platform.

The river inland of the bridge has completely changed, with a pebble sandbank in the middle opposite the playground.

#10551 18 Sep 2016 Approved Notes:

Observations made post-14 September major rain event - >100 ml in 24 hours.

Water depth gauge exposed above river water level.

River stones now exposed.

Sand bank on north side of bridge has been washed away,.

Floodwater debris on beach.

#10755 4 Sep 2016 Approved Notes:

Even more sand.

#10549 21 Aug 2016 Approved Notes:

Additional sandbank under the bridge, still there, partly covering water level gauge.

#10756 7 Aug 2016 Approved Notes:
  • more erosion of grassy bank. White pipe exposed again.
  • more sand deposition upstream of bridge.
  • depth board buried to almost 1.3m AHD
#10548 17 Jul 2016 Approved Notes:

River level gauge in isolated pool due to sand movement

#10513 3 Jul 2016 Approved Notes:

The recently installed water level gauge buried in sand.

3 photos were taken to show extensive sand coverage under the Wye River bridge.

Time 10.25

#10388 19 Jun 2016 Approved Notes:

Significant beach erosion at edge of foreshore grass - chunks are coming away.
There's a lot of sand under the bridges - up to 1.1m on the new depth measure (and rising!)

#10757 8 Jun 2016 Approved
#10351 5 Jun 2016 Approved Notes:

Water level maker needs a clean- difficult to read.

#10305 15 May 2016 Approved
#10283 1 May 2016 Approved Notes: Gusty Wind.
Heavy rain - 20 ml overnight
River flow-path now almost at top of beach edge - near road
#10251 17 Apr 2016 Approved Notes:

Rain during the week

#10231 3 Apr 2016 Approved Notes: The river seems to have resumed its normal flow- very little rain.
#10209 20 Mar 2016 Approved Notes: Mouth reopened following rain, water level in lagoon significantly lower.
#10204 6 Mar 2016 Approved Notes: River was opened for 6 days recently. Berm length is 60m
#10158 21 Feb 2016 Approved Notes: Berm first observed on the morning of Saturday 13th February 2016
Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au