Wye River Estuary

Download

280 results found (Displaying 201 - 225)
ID Date Status Details
#10133 7 Feb 2016 Approved
#10119 16 Jan 2016 Approved Notes:

The Lagoon or "pond" is closed for recreation due to high bacteria levels this advice has been given by Colac Shire council. Deidre Murphy, Corangamite Waterwatch, joined the sampling.
Length of the sand berm is 119m.

#10022 20 Dec 2015 Approved Notes: This weekend the weather fire rating scale has been Extreme. it has been hot and windy. The storm last night has given us very little rain - but lightening strikes have caused fires round us. The river has formed a large pond on the sea side of the bridge. it has big clumps of yucky vegetation floating in it. the river is still flowing into the sea although holiday makers are constantly trying to dam it.
#9981 6 Dec 2015 Approved Notes: The lagoon is getting bigger and wider, with all the sand under the bridge now submerged. Flow out was quite low.
#9953 15 Nov 2015 Approved Notes: Windspeed picked up during our observation - by the time we had finished it was more like Beaufort 4. Still a lot of sand under the bridge and around measuring scale.
#9924 1 Nov 2015 Approved
#9905 18 Oct 2015 Approved
#9870 4 Oct 2015 Approved Notes: Daylight saving began today
Main walkway to beach- Gap between the pedestrian ramp and the sand is about 50 cm- making it a very large step
There is a seaweed sculpture on the beach- made by kids.
There is a lot of sand up in the mouth of the river ,up -under the bridge.
#10023 20 Sep 2015 Approved
#9828 6 Sep 2015 Approved Notes: A very calm morning - surprisingly no wind
#9787 16 Aug 2015 Approved
#9758 2 Aug 2015 Approved
#9739 19 Jul 2015 Approved
#9700 5 Jul 2015 Approved Notes: Water was very clear following high tides and storms
#9670 21 Jun 2015 Pending Notes: .Shortest day of the year
.20/6/15 very high tide at 14.38pm , waves upstream of bridge
.erosion under beach access
.stones exposed in river bed
.white pipe on beach broken off and exposed
.river from bridge looked very clear ..not very deep
#9649 7 Jun 2015 Approved Notes: Recent storm damage observed around entry ramp to the beach and erosion of the bank- photos attached. Also photo of exposed bank and sand below the Wye bridge photopoint site.
#9608 17 May 2015 Approved
#9587 3 May 2015 Approved Notes: some grading work has been done in the past two weeks near opening of large drain. Have taken photos.
#9522 19 Apr 2015 Approved Notes: High rainfall and wind overnight
#9474 5 Apr 2015 Approved Notes: Pond area of Wye River is narrowing near the mouth - children often block the flow with 'play' constructions, see photo attached.
#9444 15 Mar 2015 Approved Notes: Otway Coast Council is replacing the old retaining wall which appears to be red-gum, with what looks like treated pine. Sand movement obvious - photos attached.
#9428 1 Mar 2015 Approved Notes: thunderstorm evening of 28/2 , lagoon beach side of bridge different shape to usual
#9410 15 Feb 2015 Approved Notes: Water height 1.3m on pole by bridge
13mm rain on Friday night but flow still low, not enough to modify lagoon
#9352 1 Feb 2015 Approved Notes: very grey previous couple of days with showers.
river pool on sea side of bridge very calm and large.
river really winding its way over the beach.

The Level of the water was at 1.35 on the pole. the water was just touching the pole.
#9334 18 Jan 2015 Approved
Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au