Observation details

Overview

Estuary Wild Dog Creek Estuary
Site Wild Dog Observation Site
Observation ID #2146
Date and Time Saturday 25th April 2009 12:30pm
Approved Approved

Notes

Due to build up of sands the sea seems to be lower. River looks moderately high due to sand bar. On the land side of the bridge, the water level is moderately high due to hold up of lower water at the mouth. It is difficult to compare levels due to change of AHD post, but i will now get a better comparison in the future.

Mouth Observation

Mouth state Open
Previous P O O O O O O O O O O O
Flow Present? Yes
Previous Y Y Y Y Y Y Y Y Y Y
Flow Direction Out
Previous O O O O O O O O O O
Above Sea Above Estuary
Berm Height (m) 0.5m
Berm Length (m)

Physical Condition

Current Mode
Wind Direction North-East
Beaufort Scale Light Breeze
Sea State Smooth

Water Levels and Tides

Water Level Start Finish
Height (m) 1.50m
Time (hh:mm) 12:45
Tidal influence No
Tidal Range Time Height
High 12:30 1.950
Low 05:22 1.030

Observation Documents

Link Date File name Description

Download
25-04-2009 12:30 Photopoint Wp1.1

Download
25-04-2009 12:30 Photopoint Wp1.2

Download
25-04-2009 12:30 Photopoint Wp1.3
Wp1.1
Wp1.2
Wp1.3
Creative Commons CC BY
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au