EstuaryWatch Data Portal
GMC Gellibrand River Estuary Mouth Observation Site
23 May 2009
Observation details
Overview
Estuary | Gellibrand River Estuary |
---|---|
Site | Gellibrand River Estuary Mouth Observation Site |
Observation ID | #2148 |
Date and Time | Saturday 23rd May 2009 11:30am |
Approved | Approved |
Notes
Changed formation of beach: sand build-up reforming, but still a return channel before estuary. Very large increase of berm into estuary. Discharge to east along beach, some to the west. Some slight flow inwards along eastside (wave surge). Sand built up east of the entrance forcing channel closer to cliffs and rocks.
Mouth Observation
Mouth state | Open |
---|---|
Previous | O O O C C C O O O O O O O O O O O O O O C O O O C C C C O O O O O O O O C C C C C C C C C O C O O O O O O P O O O O P P P C P P O O O O P P |
Flow Present? | Yes |
Previous | Y Y Y N N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y N N Y Y Y Y Y Y Y Y Y N N N N N N N N Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y |
Flow Direction | Out |
Previous | O O I N N O O I O O O O O O I O O O N O O O N N I O O O O O O O I N N N N N N N N O N O O O O O O I O O O O O I N I I O O O I I O |
Above Sea | Above Estuary | |
---|---|---|
Berm Height (m) | ||
Berm Length (m) |
Physical Condition
Current | Mode | |
---|---|---|
Wind Direction | North | |
Beaufort Scale | Fresh breeze | |
Sea State | Slight |
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au