EstuaryWatch Data Portal
WMC Wild Dog Observation Site
Active Mouth Condition 13-02-2008 - 29-09-2023Wild Dog Creek Estuary
92 results found (Displaying 61 - 70)
ID | Date | Status | Details | |
---|---|---|---|---|
#4624 | 18 Sep 2010 | Approved | Notes: Strong winds on16-17.9.2010 caused the beach to be completely covered by the sea and the sand dunes were washed flat. When the sea retreated the outlet had moved from 450 m along the beach back to 80 m from the west wall. Sea water reached the bridge but no further. Next day the AHD was back to 1.22 with no tidal influence | |
#4263 | 13 Aug 2010 | Approved | Notes: Heavy rain and high tide caused water to cover most of the east end of the beach and the sand dunes and murram grass were swept away. However at low tide the outlet to sea returned to mid beach. The photopoints were 1,2,3,Photos from west end, 4 from bridge, 5 river midbeach and 6 outlet to sea. | |
#4262 | 4 Jul 2010 | Approved |
Notes:
Outflow has moved further east to about 100m from eastern end.The photopoints are 1.2.3.Beach looking eastward from west sea wall, 4.looking to sea from roadbridge 5.looking midway along estuary 6. outlet to sea |
|
#3643 | 30 May 2010 | Approved | Notes: Strong easterly wind and highest tide in May caused sea to cover much of the beach and river to back up although general flow still out. Ahd soon fell below 1.6. Photopoints 1-3 nos.41,42,43. Photopoint 5 beach near the river outflow 45 | |
#3584 | 19 May 2010 | Approved | Notes: High tides have covered half the beach and brought outflow back about 100m westward toward centre of beach | |
#3582 | 15 Apr 2010 | Approved |
|
|
#3583 | 15 Apr 2010 | Approved |
Notes:
Photopoints 1 -172 2 - 173 3 - 174 4 - 175 |
|
#3581 | 20 Mar 2010 | Approved | Notes: Sea covered half of beach at high tide causing the river to back up | |
#3243 | 12 Feb 2010 | Approved | Notes: River running swiftly,high tide level has no influence on the AHD measurement. Due to heavy rain the outlet has moved 100m further east and is now about 450m from bridge and only 50-100m from the east end of the beach. | |
#3228 | 27 Jan 2010 | Approved | Notes: outlet is now 350m from western end of beach |
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au